Emergency Lighting — Commercial Electrical service by Dena Electronics

Commercial Electrical

Emergency Lighting

Exit signs, battery packs and egress lighting with annual code-required testing.

Overview

The BC Building Code and National Building Code of Canada require exit signs, emergency battery packs and egress lighting in all commercial buildings — plus documented monthly and annual tests. Dena Electronics installs and services complete emergency lighting systems, including battery-back-up unit equipment, LED exit signs, remote emergency heads and self-testing/self-diagnostic fixtures that log compliance automatically for your fire inspector.

Benefits

  • Meets NBCC, BCBC and CAN/ULC-S572 requirements
  • Self-testing fixtures reduce compliance paperwork
  • Photoluminescent and LED exit signs with 25-year lamp life
  • Documented annual load-testing and battery replacement

Our Process

  1. Code review

    We walk the building and identify every required exit sign, emergency head and egress path.

  2. Design & quote

    Battery calculations confirm 30- or 60-minute run time; you receive a fixed-price proposal.

  3. Permit & install

    Fixtures are installed, wired to unswitched lighting circuits and battery-tested.

  4. Annual testing

    We perform monthly-visual and annual 30/60-minute load tests and issue signed compliance reports.

  5. Documentation

    All test logs and battery replacement records are delivered for your fire safety plan.

Frequently Asked Questions

How often does emergency lighting need to be tested?

Monthly visual and functional tests, plus an annual full-duration discharge test, are required — we can perform both under a service agreement.

How long must the lights stay on during an outage?

Most commercial occupancies require a minimum 30-minute run time; some high-rise and assembly occupancies require 60 minutes.

Can you retrofit our old battery packs?

Yes — most legacy unit equipment can be replaced with modern LED heads and self-testing packs during a single service call.

What happens if we fail a fire inspection?

We prioritise deficiency corrections and can provide same-week service to get your building back into compliance.

Project Gallery

Emergency Lighting project example by Dena Electronics
Office Electrical Systems project example by Dena Electronics
Retail Electrical project example by Dena Electronics
Restaurant Electrical project example by Dena Electronics

Request a quote

Ready to start your project?